Shihchiu Construction & Exploration Engineering Co., Ltd.

Guoguang Power Plant Large-Diameter Pile Foundation Project

Installation of large-diameter drilled shafts to strengthen the safety and stability of the plant’s foundation system.

Full-casing pile construction was planned in accordance with overall plant development requirements and site conditions, ensuring that the foundation structure meets applicable safety and durability standards.